Andrew Forrest founded Fortescue in 2003 with no mines and no railway. Two decades later, it ships more than 200 million tonnes of iron ore a year. Here’s how it makes its money.
Fortescue is one of the world’s largest iron ore producers and one of the biggest companies on the ASX.
It was founded in 2003 by Andrew Forrest, who set out to challenge BHP and Rio Tinto in the Pilbara region of Western Australia. With no existing mines or infrastructure, Fortescue built its own mines, railway and port at Port Hedland, shipping its first ore in 2008. Forrest remains its largest shareholder and executive chairman.
Fortescue reports in U.S. dollars, and its financial year ends on 30 June.
Iron ore
Iron ore, the main ingredient in steel, makes up almost all of Fortescue’s earnings. It runs mines in the Chichester and Solomon hubs of the Pilbara, and Iron Bridge, a magnetite project that produces a higher-grade product.
Most of its ore is sold to steelmakers in China. Fortescue’s ore has historically been lower grade than its rivals’, so it sells at a discount, but its low production costs help it stay profitable.
Because it relies so heavily on one commodity and one customer, Fortescue’s profits and share price rise and fall sharply with the iron ore price and China’s economy.
Green energy ambitions
Under Forrest, Fortescue set out to become a major producer of green hydrogen and renewable energy. It announced projects around the world, but in 2024 scaled back those plans and cut jobs, saying green hydrogen was taking longer to become profitable.
It now focuses on cutting emissions from its own mines, aiming to reach “real zero” emissions from its operations by 2030 by replacing diesel and gas with solar, wind, batteries and electric equipment. It is also looking for growth in copper and other metals.
The risks
The risks include a fall in iron ore prices, a slowdown in Chinese steel production, new supply from Guinea’s Simandou project, rising costs and the large spending needed to decarbonise. Dino Otranto is chief executive of its metals and operations business.
Latest results, as at 9 November 2026
Full year to June 2026, reported 20 August 2026: revenue rose 9 per cent to US$17 billion, and underlying profit rose 3 per cent to US$3.5 billion. It shipped a record 201.3 million tonnes of iron ore, at a cost of US$18.74 a tonne. Fortescue paid total dividends of $1.08 a share, fully franked.
For the 2027 financial year, it expects to ship between 197 and 207 million tonnes, with costs rising to between US$20.50 and US$21.75 a tonne.
Next update: Fortescue reports its half-year results, to December 2026, in February 2027.





















Comments
No comments yet. Start the conversation.